ROV PILOT.

 

 

 

 

 

 

 

 

Odilon Vasco Cardoso Filho

54 years, married,

Nationality  Brazil

José Silva 232

Pechincha – Jacarepaguá 22743-080 Rio de Janeiro, Rio de Janeiro – Brasil
0055 21 2424 6944 home 0055 21 6875 1672 mobile
odilon.rov@gmail.com
Linked in

Objective
Professional profile
OFFSHORE WORK RESUME

01/01 – 11/04

PLSV Lochnagar

DSND Consub SA

(Brazil, Campos Basin)

Petrobras Demon 08 & 09

ROV PILOT Flexible pipe lay operations (Brazil)

Free swimming & Garaged systems,
DSND Hot stab system, DSND
Torque tool, Schilling 7R & 7P
manips + Rigmaster manips

11/04 – 22/11

PLSV Kommandor 3000

DSND Consub SA

( Brazil,Campos Basin)

Petrobras Demon 10 & 11

On-site Mobilization
ROV PILOT

Flexible pipe lay operations (Brazil)

Free swimming & Garaged systems,
DSND Hot stab system, DSND
Torque tool, Schilling 7R & 7P
manips + Rigmaster manips

OFFSHORE WORK RESUME

Date Vessel / Company Client ROV / Position held Workscope / Ancillary equip.

1999

22/11 – 31/12

PLSV Kommandor 3000

DSND Consub SA

(Brazil, Campos Basin)

Petrobras Demon 10 & 11

ROV PILOT
Flexible pipe lay operations (Brazil)

Free swimming & Garaged systems,
DSND Hot stab system, DSND
Torque tool, Schilling 7R & 7P
manips + Rigmaster manips

2000

01/01 – 31/12
PLSV Kommandor 3000

DSND Consub SA

(Brazil, Campos Basin)

Petrobras Demon 10 & 11

ROV PILOT Flexible pipe lay operations (Brazil)

Free swimming & Garaged systems,
DSND Hot stab system, DSND
Torque tool, Schilling 7R & 7P
manips + Rigmaster manips

2001

01/01 – 31/12
PLSV Kommandor 3000

DSND Consub SA

(Brazil, Campos Basin)

Petrobras Demon 10 & 11

ROV PILOT Flexible pipe lay operations (Brazil)

Free swimming & Garaged systems,
DSND Hot stab system, DSND
Torque tool, Schilling 7R & 7P
manips + Rigmaster manips

2002

01/01 – 29/11
PLSV Kommandor 3000

DSND Consub SA
& Subsea 7, Brazil

(Brazil, Campos Basin)

Petrobras Demon 10 & 11

ROV PILOT Flexible pipe lay operations (Brazil)

Free swimming & Garaged systems,
DSND Hot stab system, DSND
Torque tool, Schilling 7R & 7P
manips + Rigmaster manips

2002 / 04

30/11 – 31/10

PLSV Kommandor 3000

Subsea 7, Brazil.

(Brazil, Campos Basin)

Shell / IMODEC
&
Halliburton KBR / Petrobras Demon 10 & 11

ROV PILOT Flexible pipe lay operations (Brazil)

Bijupirá / Salema & Caratinga /
Barracuda Feild Development Project.

Jumper installation (VCM + flexible pipeline) – Hydraulic & Electric lead installations (ROV Intervention HFL
& EFL installation).

Free swimming & Garaged systems,
RHL & Neron Hot stab systems,
Oceaneering Torque tool & FLOT Schilling Titan 3 manips + Rigmaster manips, Zetechtics TCSS &
Oceaneering TCS, multi-task zero leak stab connects.

OFFSHORE WORK RESUME

Date Vessel / Company Client ROV / Position held Workscope / Ancillary equip.

2004
01/11 – 31/12
Kommandor 3000

Subsea 7, Brazil.

(Brazil, Campos Basin)
Shel / Imodec
Halliburton / KBR / Petrobras Demon 10 & 11

ROV PILOT FPSO in field mobilisation.

Delmar anchor to suction pile connections (FPSO anchor hook up),
+ Bundle pull ins to FPSO.

Barracuda & Caratinga Field devolopement project.; 7 function Rigmaster manip, & 7 function Conan 7P, WO32 Hydraulic cutter.
2005
01/01 – 01/03
Kommandor 3000

Subsea 7, Brazil.

(Brazil, Campos Basin)
KBR (Halliburton) Demon 07

ROV PILOT FPSO in field mobilisation.

Delmar anchor to suction pile connections (FPSO anchor hook up),
+ Bundle pull ins to FPSO.

Barracuda & Caratinga Field devolopement project.

Standard 100hp ROV freeswimming spread; 7 function Rigmaster manip, & 7 function Conan 7P, WO32 Hydraulic cutter.

07/03 – 19/10

Jaket inspection
Subsea 7, Brazil

(Brazil, Campos Basin)
Petrobras Surveyor plus

ROV Supervisor
Jaket Inspection

2006

20/10 – 04/05

Kommandor 3000

Subsea 7, Brazil.

(Brazil, Campos Basin)

Petrobras Demon 10 / 11

ROV PILOT

Flexible pipe lay operations (Brazil)

Bijupirá / Salema & Caratinga /
Barracuda Feild Development Project.

Jumper installation (VCM + flexible pipeline) – Hydraulic & Electric lead installations (ROV Intervention HFL
& EFL installation).

Free swimming & Garaged systems,
RHL & Neron Hot stab systems,
Oceaneering Torque tool & FLOT Schilling Titan 3 manips + Rigmaster manips, Zetechtics TCSS &
Oceaneering TCS, multi-task zero leak stab connects.

OFFSHORE WORK RESUME

Date Vessel / Company Client ROV / Position held Workscope / Ancillary equip.

2006 D
04/05 – 01/012
Subsea 7, Brazil.

DSV Toisa Sentinel

Petrobras Demon-6

Tiger Divers Operations
2007
04/12 – 07/07 RSV Kommandor 2000

Subsea 7, Brazil.

Petrobras Hercules 16 Jumper installation (VCM + flexible pipeline) – Hydraulic & Electric lead installations (ROV Intervention HFL
& EFL installation).Metrology
Torque tool & FLOT Schilling Titan 3 manips.
2008
04/12 – 11/07 RSV Seisranger

Subsea 7, Brazil.

Petrobras Hercules 19 & 21 Jumper installation (VCM + flexible pipeline) – Hydraulic & Electric lead installations (ROV Intervention HFL
& EFL installation).Metrology
Torque tool & FLOT Schilling Titan 3 manips.
2009
01/09 -12/09
Subsea 7, Brazil.

PLSV SevenOcean

Petrobras Pipelay Support Vessel ROV PILOT
Jumper installation (VCM + flexible pipeline) – Hydraulic & Electric lead installations (ROV Intervention HFL
& EFL installation). Metrology
Torque tool & FLOT Schilling Titan 3 manips.

Educational Background
  • Level of Education
    Techinical
Languages
Portuguese: reading fluent, writing fluent, conversation fluent
English: reading intermediate, writing intermediate, conversation intermediate
 

 

Advertisements